[1]
Car-Pušić, D., Tijanić, K., Marović, I. and Mlađen, M. 2020. Predicting buildings construction cost overruns on the basis of cost overruns structure. Scientific Review Engineering and Environmental Sciences (SREES). 29, 3 (Sep. 2020), 366–376. DOI:https://doi.org/10.22630/PNIKS.2020.29.3.31.