Determining the nature and value of the risk of geodetic works using fuzzy logic

Main Article Content

Magdalena Kowacka
Dariusz Skorupka
Artur Duchaczek
Dominika Dudziak-Gajowiak
Agnieszka Waniewska


Keywords : construction, risk, geodesy, road
Abstract
The article is a continuation of the series of
works on the method for risk analysis in surveying works in road construction projects.
The paper presents the application of fuzzy
logic to determine the nature and value of the
risk of surveying works based on a database
of rules and affiliation functions provided by
experts. The fact that the issue of occurrence
of risk factors in road construction works is
not deterministic justifies the above. In such
works, there are many uncertainties in establishing the value of their duration in the
long term. The theoretical framework of the
method is presented together with an example of its application. Moreover, research
results are compared with previous publications using other research tools.

Article Details

How to Cite
Kowacka, M. ., Skorupka, D., Duchaczek, A. ., Dudziak-Gajowiak, D. ., & Waniewska, A. (2020). Determining the nature and value of the risk of geodetic works using fuzzy logic. Scientific Review Engineering and Environmental Sciences (SREES), 29(4), 494–502. https://doi.org/10.22630/PNIKS.2020.29.4.43
References

Bubnicki, Z. (2005). Teoria i algorytmy sterowania. Warszawa: Państwowe Wydawnictwo Naukowe.

Ficoń, K. (2013). Zastosowanie rozmytych sterowników Mamdaniego do określania ryzyka wieloczynnikowego. Zeszyty Naukowe Akademii Marynarki Wojennej, 54(3), 65-88. (Crossref)

Hoła, B. (2010). Methodology of hazards identification in construction work course. Journal of Civil Engineering and Management, 16(4), 577-585. (Crossref)

Hoła, B. i Szóstak, M. (2014). Analysis of the development of accident situations in the construction industry. Procedia Engineering, 91, 429-434. (Crossref)

Kacprzyk, J. (1986). Zbiory rozmyte w analizie systemowej. Warszawa: Państwowe Wydawnictwo Naukowe.

Kacprzyk, J. (1997). Multistage fuzzy control: a model-based approach to fuzzy control and decision making. Chichester: Wiley.

Klir, G.J. i Folger, T.A. (1988). Fuzzy sets, uncertainty, and information. Englewood Cliff: Prentice Hall.

Kowacka, M. (2019). Metoda analizy ryzyka prac geodezyjnych w przedsięwzięciach budowy dróg (rozprawa doktorska). Politechnika Wrocławska, Wrocław.

Kowacka, M., Skorupka, D., Duchaczek, A., Waniewska, A. i Dudziak-Gajowiak, D. (2019). Risk analysis in surveying works related to roads construction. Scientific Review - Engineering and Environmental Sciences, 28(3), 377-382. (Crossref)

Leśniak, A. i Janowiec, F. (2019). Risk assessment of additional works in railway construction investments using the Bayes Network. Sustainability, 11(19), 5388. https://www.doi.org/10.3390/su11195388 (Crossref)

Leśniak, A., Juszczyk, M. i Piskorz, G. (2019). Modelling delays in bridge construction projects based on the logit and probit regression. Archives of Civil Engineering, 65(2), 107-120. (Crossref)

Pedrycz, W. (1993). Fuzzy control and fuzzy systems. Taunton: Research Studies Press.

Sivanandam, S.N., Sumathi, S. i Deepa, S.N. (2007). Introduction to fuzzy logic using MATLAB. Berlin: Springer. (Crossref)

Sobotka, A., Radziszewska-Zielina, E., Plebankiewicz, E., Zima, K. i Kowalik, M. (2014). Realizacja robót ziemnych w opinii wykonawców budowlanych. Scientific Review - Engineering and Environmental Sciences, 23(1), 3-13.