Deviations and implementation of the budget and schedule of construction projects monitored by the bank supervision on the example of residential buildings

Main Article Content

Jarosław Konior
Mariusz M. Szóstak


Keywords : construction project management, cost, time, bank investment supervisor
Abstract
Time and cost are key elements that determine the success or failure of construction
projects. The aim of the article is to analyze
and assessment of the course of various construction projects in the field deviations and
implementation of the budget and schedule
of construction projects. Calculations made
in accordance with the earned value methodology allowed the assessment of the actual
cost of the work performed and scheduled for
the analyzed construction projects. The data
for analysis was obtained from the authors’
own experience and professional work. The
authors carried out bank investment supervision in the years 2006–2019 on behalf of the
banks that grant investment loans for non-public contracts.

Article Details

How to Cite
Konior, J. ., & Szóstak, M. M. . (2020). Deviations and implementation of the budget and schedule of construction projects monitored by the bank supervision on the example of residential buildings. Scientific Review Engineering and Environmental Sciences (SREES), 29(4), 485–493. https://doi.org/10.22630/PNIKS.2020.29.4.42
References

Al-Jibouri, S.H. (2003). Monitoring systems and their effectiveness for project cost control in construction. International Journal of Project Management, 21(2), 145-154. (Crossref)

Andrade, P.A., Martens, A. de i Vanhoucke, M. (2019). Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities. Automation in Construction, 99, 68-78. (Crossref)

Araszkiewicz, K. (2016). Zarządzanie ryzykiem przedsięwzięć budowlanych w środowisku wieloprojektowym. Finanse, Tynki Finansowe, Ubezpieczenia, 4(82), 559-569. (Crossref)

Bauer-Celny, A., Konior, J. i Szóstak, M. (2006-2019). Initial, Monthly, Close-out Reporting of Bank Investment Supervision; PM Group Polska sp. z o.o. 2006–2015 and 3EPCM sp. z o.o. 2016-2019: Wrocław, Poland.

Czarnigowska, A. (2008). Earned value method as a tool for project control. Budownictwo i Architektura, 3(2), 15-32. (Crossref)

Dziadosz, A., Kapliński, O. i Rejment, M. (2014). Usefulness and fields of the application of the Earned Value Management in the implementation of construction projects. Budownictwo i Architektura, 13(4), 357-364. (Crossref)

Głodziński, E. (2014). Zarządzanie projektami w warunkach niepewności – zakres i metodyka. Przegląd Organizacji, 7, 34-40. (Crossref)

Kerzner, H. (2003). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. New York NY: John Wiley & Sons.

Khamidi, M.F., Ali, W. i Idrus, A. (2011). Application of Earned Value Management System on an Infrastructure Project: A Malaysian Case Study. International Conference on Management Science & Engineering, 8, 1-5.

Khamooshi, H. i Golafshani, H. (2014). EDM: Earned Duration Management, a new approach to schedule performance management and measurement. International Journal of Project Management, 32(6), 1019-1041. (Crossref)

Kwon, O., Kim, S., Paek, J. i Eom, S.J. (2008). Application of Earned Value in the Korean Construction Industry. Journal of Asian Architecture and Building Engineering, 7(1), 69-76. (Crossref)

Mingus, N. (2001). Alpha Teach Yourself Project Management. New York: Simon & Schuster.

Połoński, M. (2015). Kontrola kosztów realizacji obiektu budowlanego metodą Earned Value. W T. Kasprowicz (red.), Inżynieria przedsięwzięć budowlanych: Rekomendowane metody i techniki (strony 81-125). Warszawa: Komitet Inżynierii Lądowej i Wodnej PAN.

Połoński, M. (2018). Kierowanie budowlanym procesem inwestycyjnym. Warszawa: Wydawnictwo SGGW.

Połoński, M. i Komendarek, P. (2011). Bieżąca kontrola kosztów realizacji obiektu budowlanego metodą earned value. Metody Ilościowe w Badaniach Ekonomicznych, 12(2), 279-290.

Połoński, M. i Ziółkowska, A. (2018). Prognozowanie w metodzie EVM terminu i kosztu końcowego realizacji obiektu na podstawie bieżącego zaawansowania. W A. Sobotka, E. Radziszewska-Zielina (red.), Inżynieria przedsięwzięć budowlanych: problemy, modele, metody (strony 207-233). Warszawa - Kraków: Komitet Inżynierii Lądowej i Wodnej PAN.

Project Management Institute [PMI] (2008). A guide to the project management body of knowledge (PMBOK guide). Pensylvania: Project Management Institute.

Vandevoorde, S. i Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24(4), 289-302. (Crossref)

Zavadskas, E.K., Turskis, Z. i Tamođaitienë, J. (2010). Risk assessment of construction projects. Journal of Civil Engineering and Management, 16(1), 33-46. (Crossref)

Ziółkowska, A. i Połoński, M. (2015). Application of the EVM method and its extensions in the implementation of construction objects. Engineering Structures and Technologies, 7(4), 189-196. (Crossref)

Statistics

Downloads

Download data is not yet available.
Recommend Articles